Damaged or new?
Start by separating repair/cladding from new-build process selection.
Public decision map
Repair, cladding, large-part AM, SLM alternatives, machining, welding, and replacement review.
Use this map to turn a rough part question into a preliminary route signal. It keeps LMD, SLM/LPBF, cladding, machining, welding, replacement, missing information, and inspection evidence in the same decision language.
Preliminary decision-support only. Final feasibility depends on base material, geometry, service conditions, inspection requirements, and expert review.
Decision structure
It does not replace expert review. It makes the route conversation less vague before an RFQ or internal review starts.
Start by separating repair/cladding from new-build process selection.
Large and local often points toward LMD; small and fine-detail may point toward SLM/LPBF or CNC.
Local material addition is a strong LMD signal; full geometry needs a wider process comparison.
The failure mode changes the material, inspection, and route risk.
SLM/LPBF can be stronger when the part is small, complex, or needs internal channels.
Some requests are not LMD-first until missing stock, crack root cause, economics, or inspection are clarified.
Interactive map
The output becomes a standard LMD Decision Brief object that can be copied, exported, and routed to expert review.
Static versions
The SVG is useful for presentations and LinkedIn. The Markdown source is useful for AI retrieval, internal notes, and source-aware reuse. Use browser print to save this page as a PDF.
Agent workflow